Planned Ops / Infrastructure Enhancements

by

As outlined in the original post by Brian, we are planning on implementing operational and infrastructure enhancements to help improve the stability and accuracy of the Twapper Keeper service both in the short and long term.

The following slide deck provides insight into the current backend architecture of the service, outlines the challenges we are currently facing as the service scales, and the changes that will be implemented to improve the quality of service to the user community.

The time line for the completion of these activities is 3 weeks, and we will be looking for feedback from the user community as user facing items are implemented.

2 Responses to “Planned Ops / Infrastructure Enhancements”

  1. Find out if Twapper Keeper is healthy or sick… « Twapper Keeper's Blog Says:

    […] enhancement aligns with one of the enhancements outlined in the Ops / Infrastructure work product https://twapperkeeper.wordpress.com/2010/04/27/planned-ops-infrastructure-enhancements/ and is based upon a request from Martin Hawksey – […]

  2. Details of Work Product 1 – Sustainability – “Improve long term sustainability and accuracy of Twapper Keeper archives.” « Twapper Keeper's Blog Says:

    […] The summary of the issues and a plan was outlined in the Power Point presentation published on the project blog titled Twapper Keeper Operations / Infrastructure Enhancements on 4/25/2009 (https://twapperkeeper.wordpress.com/2010/04/27/planned-ops-infrastructure-enhancements/) […]

Comments are closed.


%d bloggers like this: